General Zone Hospital in Pachuca

Construction of the 144-bed District General Hospital. The scope includes civil engineering and installations. The works make use of a structure already started, for what was going to be a Multi-Speciality Hospital, and therefore include:
- Reinforcement of the existing structure.
- Exterior works..
- Masonry, bricklaying.
- Finishes.- Hydraulic, sanitary, electromechanical and special installations.

  • Name: District General Hospital in Pachuca
  • Construction Company: Sacyr Construcción México S.A. de C.V.
  • Client: Mexican Social Security Institute (IMSS)
  • Execution dates: August 2017 - September 2019

39,5

Amount (million €)

51%

Stake (%)

36.458

m² gross floor area

144

No. of beds