Expansion of the Port of Praia

The works consisted of refurbishing and extending the dock by 233 m, a frontline container park in a maritime spillway, construction of a protective dyke, dredging to fix the bed at level -12 to allow access by boats, and the container park complex including the access road, infrastructures and control building.

· Name: Expansion of the Port of Praia

· Construction company: CVC - Cabo Verde Construcciones SARL

· Client: MITT

· Execution dates: 2010 - 2013

71,998

Amount (million €)

37,5%

Stake (%)

233

Dyke length (m)

69.619

m³ of concrete