Almudevar Reservoir

The reservoir will have a capacity of 169.71 cubic hectometres and receive the flows through a channel from which will be pumped the waters from the Gállego River from the Monegros Canal – downstream of the La Sotonera Dam – and the surpluses from the Cinca River. The reservoir will be closed with two dams that will flood over 1,152 ha.

  • Name: Almudevar Reservoir
  • Construction company:  Sacyr Infraestructuras S.A.
  • Client: Ministry of Agriculture, Food and Environment
  • Execution dates: November 2017 - November 2021

84,722

Amount (million €)

30%

Stake (%)

41,5

Dam height (m)

169,71

Volume of water captured (hm³)