Moncloa transport hub

The works consisted of the construction of a new transport hub under the Arco de la Victoria square, featuring an access building in the Plaza de la Junta Municipal square in Moncloa; the remodelling of the existing hub to adapt it to the characteristics of the new module; the construction of a new car park for the District Council in Calle Isaac Peral to replace the existing one, and a new tunnel for outbound buses leaving Madrid. The lower level enables the connection with the Moncloa metro station and between metro lines 6 and 3.

 

  • Name: Moncloa transport hub
  • Construction company: Sacyr
  • Client: Consorcio Regional de Transportes
  • Execution dates: March 2006 - December 2008

77,182

Amount (million €)

100%

Stake (%)

47.000

m² built area

57.500.000

Passengers / year